BUILDING A NEW DRIVE Step 1: Excavation to a minimum depth of 8". Step 2: Installation of a geotextile material as barrier between the sub grade and stone. It also acts as support as needed. Step 3: Minimum of 4" of the appropriate base stone. Step 4: Minimum of 4" of top finish stone. |